Preloader

Mbare Musika Temporary Traders Market Redevelopment

Project Overview

Client Name:

Government of Zimbabwe (in collaboration with Harare City Council)

Project Name:

Mbare Musika Temporary Traders Market Redevelopment

Category:

Civil and Structural Engineering

Duration:

1 Year

Date:

2024–2025

The Mbare Musika Temporary Traders Market Redevelopment was an emergency infrastructure project initiated following a devastating fire that destroyed one of Zimbabwe’s most critical fresh produce and informal trading hubs. Declared a State of National Disaster, the project required the rapid restoration of trading activities to protect livelihoods and stabilise economic activity ahead of the festive season.
UIP Africa was appointed to deliver end-to-end civil and structural engineering design alongside full project management services, ensuring the facility was delivered at unprecedented speed while maintaining structural integrity, functionality, and public safety.

Project solutions & problem

The project arose from an acute national crisis. On 8 October 2024, a major fire engulfed the Mbare Traders Market, destroying thousands of trading stalls and merchandise and affecting approximately 4,695 traders, with estimated economic losses exceeding USD 2 million.

Key Challenges:

Extreme Urgency:

The market needed to be operational within one to three months to support trader recovery ahead of the festive trading period

Post-disaster conditions:

Delivery under a nationally declared disaster, requiring sensitivity, urgency, and decisive coordination

Large-scale functionality:

Accommodating thousands of traders and customers safely within a constrained urban environment

Infrastructure resilience:

Addressing historical deficiencies in fire safety, drainage, access, and service coordination

Multi-stakeholder alignment:

Coordinating government agencies, municipal authorities, contractors, and trader representatives under compressed timelines

Project Solutions:

UIP Africa adopted a fast-track, design-led delivery approach, combining technical rigor with proactive project management to meet the exceptional demands of the assignment. Our focus was on constructability, speed, durability, and compliance, ensuring rapid delivery without compromising engineering standards.

Key Engineering Solutions:

Designed a rapidly constructible portal-frame structural system spanning approximately 6,000 m², optimised for speed of erection and long-term performance

Delivered comprehensive civil engineering designs, including bulk earthworks, heavy-duty pavements, service lanes, customer parking areas, and delivery bays

Engineered an integrated stormwater drainage system to mitigate flooding risk and protect the facility during peak rainfall events

Designed and coordinated water supply and sewer reticulation systems to support sanitation, hygiene, and fire response requirements

Supported government objectives under the “Build Back Better” framework by embedding improved safety, organisation, and formalisation principles into the market layout

The Outcome & Impact

The Mbare Musika redevelopment stands as a benchmark example of emergency infrastructure delivery under crisis conditions, demonstrating the impact of decisive engineering leadership and coordinated execution.

Measured Outcomes and Benefits: