Ziminya Dam Water Security & Irrigation Project

Project Overview

Client Name:

Zimbabwe National Water Authority (ZINWA)

Project Name:

Ziminya Dam Water Security & Irrigation Project

Category:

Industrial Construction

Durations:

Ongoing (target completion aligned with the Vision 2030 programme)

Location:

Nkayi District, Matabeleland North Province, Zimbabwe

Date:

-

Unlocking long-term water security and economic resilience in drought-prone Matabeleland North.

 

The Ziminya Dam Water Security & Irrigation Project is a strategic national water infrastructure initiative aimed at addressing chronic water shortages in Nkayi District and the wider Matabeleland North region. Developed as a multi-purpose dam, the project is designed to provide reliable domestic water supply, support irrigation-based agriculture, and enable community-driven economic activities.

Managed by the Zimbabwe National Water Authority (ZINWA), the project forms part of the Government of Zimbabwe’s broader investment in high-impact water infrastructure to support Vision 2030, climate resilience, and sustainable rural development.

Size / Scale

  • Storage capacity: ±98 million cubic metres
  • Catchment: Shangani River system
  • Regional ranking: Second-largest inland water body in Matabeleland North

Our Services:

Civil Engineering Design Support
Water Infrastructure Engineering
Project Support & Technical Coordination

Status: Under Construction

Under Construction (Intermediate Stage)

Project solutions & problem

Matabeleland North is among Zimbabwe’s most drought-prone regions, with communities historically reliant on seasonal rainfall and limited surface water sources. The absence of large-scale water storage infrastructure has constrained agricultural productivity, economic development, and long-term water security.

Key challenges driving the Ziminya Dam project include:

Project Problem:

Chronic water scarcity:

Affecting communities, livestock, and agricultural activities

Climate variability:

Resulting in frequent drought cycles and reduced surface water availability

Limited irrigation infrastructure:

Restricting food security and year-round agricultural production

Rural economic vulnerability:

Limited opportunities for sustained income generation

Project Solutions:

The Ziminya Dam project was structured as a long-term, multi-purpose water resource solution, designed to deliver sustained socio-economic benefits rather than short-term relief. Engineering and planning decisions focused on storage capacity, catchment efficiency, resilience, and future scalability.

Key Engineering Solutions:

Development of a large-capacity water storage dam with an approximate capacity of 98 million cubic metres, designed to support multi-sector water demand

Strategic utilisation of the Shangani River catchment to maximise reliable inflows and long-term yield

Planned integration of modern irrigation schemes to enable consistent agricultural production and climate resilience

Provision for domestic water supply infrastructure to serve Nkayi Growth Point and surrounding settlements

Inclusion of community-focused economic activities, such as fisheries and nutritional gardens, to broaden development impact.

The Outcome & Impact (Anticipated)

Although still under construction, the Ziminya Dam is already recognised as a transformational investment for Matabeleland North, with significant long-term benefits anticipated upon completion.

Anticipated Impact: