{"id":24,"date":"2026-08-06T13:36:02","date_gmt":"2026-08-06T13:36:02","guid":{"rendered":"http:\/\/139.84.241.235\/zra\/bulletin\/maintenance-schedule-for-kariba-spillway-gates-1-through-6\/"},"modified":"2026-08-06T13:36:02","modified_gmt":"2026-08-06T13:36:02","slug":"maintenance-schedule-for-kariba-spillway-gates-1-through-6","status":"publish","type":"zra_bulletin","link":"http:\/\/139.84.241.235\/zra\/bulletin\/maintenance-schedule-for-kariba-spillway-gates-1-through-6\/","title":{"rendered":"Maintenance Schedule For Kariba Spillway Gates 1 Through 6"},"content":{"rendered":"<p>Annual technical inspection and seal replacement commences next month to ensure structural integrity ahead of the peak rainy season.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Annual technical inspection and seal replacement commences next month to ensure structural integrity ahead of the peak rainy season.<\/p>\n","protected":false},"featured_media":0,"menu_order":0,"template":"","zra_bulletin_category":[],"class_list":["post-24","zra_bulletin","type-zra_bulletin","status-publish","hentry"],"_links":{"self":[{"href":"http:\/\/139.84.241.235\/zra\/wp-json\/wp\/v2\/zra_bulletin\/24","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/139.84.241.235\/zra\/wp-json\/wp\/v2\/zra_bulletin"}],"about":[{"href":"http:\/\/139.84.241.235\/zra\/wp-json\/wp\/v2\/types\/zra_bulletin"}],"wp:attachment":[{"href":"http:\/\/139.84.241.235\/zra\/wp-json\/wp\/v2\/media?parent=24"}],"wp:term":[{"taxonomy":"zra_bulletin_category","embeddable":true,"href":"http:\/\/139.84.241.235\/zra\/wp-json\/wp\/v2\/zra_bulletin_category?post=24"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}