{"id":30,"date":"2026-08-06T13:36:03","date_gmt":"2026-08-06T13:36:03","guid":{"rendered":"http:\/\/139.84.241.235\/zra\/tender\/refurbishment-of-kariba-north-bank-spillway-gate-hoisting-mechanisms\/"},"modified":"2026-08-06T13:36:03","modified_gmt":"2026-08-06T13:36:03","slug":"refurbishment-of-kariba-north-bank-spillway-gate-hoisting-mechanisms","status":"publish","type":"zra_tender","link":"http:\/\/139.84.241.235\/zra\/tender\/refurbishment-of-kariba-north-bank-spillway-gate-hoisting-mechanisms\/","title":{"rendered":"Refurbishment Of Kariba North Bank Spillway Gate Hoisting Mechanisms"},"content":{"rendered":"<p>Replacement of hydraulic power packs and servo cylinders on spillway gates 4, 5 and 6 with 20-year design life.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Replacement of hydraulic power packs and servo cylinders on spillway gates 4, 5 and 6 with 20-year design life.<\/p>\n","protected":false},"featured_media":0,"menu_order":3,"template":"","class_list":["post-30","zra_tender","type-zra_tender","status-publish","hentry"],"_links":{"self":[{"href":"http:\/\/139.84.241.235\/zra\/wp-json\/wp\/v2\/zra_tender\/30","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/139.84.241.235\/zra\/wp-json\/wp\/v2\/zra_tender"}],"about":[{"href":"http:\/\/139.84.241.235\/zra\/wp-json\/wp\/v2\/types\/zra_tender"}],"wp:attachment":[{"href":"http:\/\/139.84.241.235\/zra\/wp-json\/wp\/v2\/media?parent=30"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}