Strategic Project

Kariba HES

Project overview

Site Location

The Kariba Hydro-electric Scheme is located approximately halfway down the Zambezi River that flows from the north-western part of Zambia, Southern Africa, to the Indian Ocean. It lies in the Gwembe Valley at Latitude 16031′ South and Longitude 28046′ East. The width of the Gwembe rift valley is 70km on average and is bordered on either side by escarpments which go approximately 700 metres high.

Background

The Electricity Supply Commission, instigated an investigation for possible hydro-electric schemes to be constructed at Kariba. In 1941, funds were made available and in 1955 the then Federal Government of Rhodesia and Nyasaland (Zambia, Zimbabwe and Malawi) called for tenders for the construction of the dam wall. The contract for the construction of the wall and power station was awarded to the Italian consortium Impresit on 16 July 1956.

Kariba Dam was designed by the French engineer Andre Coyne. A specialist in “arch dams”, he personally designed over 55 dams, Kariba being one of them. Excavations of the foundations, construction of dam wall and power stations and the subsequent commissioning of the first generator took place between 1956 and 1960.

Technical Data
TypeDouble Curvature Concrete Arch
Height128 metres
Crest Length617 metres
Crest Thickness13 metres
Base Thickness24 metres
Volume of Concrete1,036 million cubic metres
Spillway
6 No. Sluice gates9.14 x 8.84 metres
Discharge Capacity6 x 1574 cubic metres per second (at full supply level)
Plunge Pool
Depth81 metres
Volume335 x 103 cubic metres of water
Reservoir (at full supply level)
Length280 kilometres
Width32 kilometres (km) widest, (average 18 km)
Maximum Retention Level (MRL)487.8 metres (above mean sea level)
Minimum Operating Level (MOL)474.8 metres (above mean sea level)
Capacity at MRL185 x 109 cubic metres
Mean Annual Evaporation1.56 metres
Power Stations (Generating Capacity)
North Bank1080 MW
South Bank1050 MW

Dam Safety Performance Monitoring and Maintenance

Monitoring

Dam safety Monitoring consists of measurements of parameters which define the state of the structure and provide timely information on the behaviour of the dam complex. Visual surveillancesare conducted at regular intervals to look for symptoms that might warn of a developing failure.

An array of instruments are installed at strategic locations of the dam to monitor movements, stresses, deformations and discharges.

Geodetic Surveys are carried out periodically and these comprise Traverse, Triangulation and Levelling.

Maintenance/Inspection

Routine inspections provide information for routine maintenance work which is carried out periodically on the dam and its appurtenances. Works to stabilise the South Bank have been carried out and they include drilling of drainage adits, surface sealing of the South Bank slope and ground reprofiling.

Flood Gates

The spillway comprises six sluices each equipped with a caterpillar gate furnished with an electric programmable logical control hoist mechanism that provides safety in the operation of each gate.

Stilling Pool

The stilling pool is located below the spillway and serves to dissipate energy from the spillway discharge.

The Emergency Preparedness Program was compiled to aid the Dam Safety Monitoring Team during emergency situations or  unusual occurrences. The program essentially outlines the following:

  • Immediate actions to be taken
  • Whom to notify
  • What decisions to make
  • Actions to take in an event of loss of communications

Emergency Situation:

An emergency situation is defined as a sudden and unexpectedcondition that may develop so as to endanger the structural integrity of the dam, or endanger downstream property and people.The situation would call for immediate action and attention.

Unusual Occurrence:

An unusual occurrence is defined as an event that takes place or a condition that develops that is not normally encountered in the routine operation of the dam and reservoir and which may endanger the dam.